The contractor will typically use one of two methods to transport fill: for levee areas nearer to Sea Cloud Park, they will use smaller dump trucks that can travel along the levee; for levee areas further from the Sea Cloud Park, they will use haul trucks on surface streets. The work will be sequenced so as not to damage any recently-constructed areas of the Levee Trail. Additional staging areas have been identified which will be used to minimize transport of fill on surface streets.