Articles
*Please note a subscription may be needed to view the articles below.
- November 24, 2019 – Fox KTVU 2
- June 18, 2021 – San Francisco Chronicle
- August 10, 2021 – San Mateo Daily Journal
- June 11, 2022 – San Mateo Daily Journal
- March 13, 2023 – San Mateo Daily Journal
- July 18, 2023 – San Mateo Daily Journal
- October 19, 2023 – San Mateo Daily Journal
- November 20, 2023 – San Francisco Chronicle
- February 22, 2024 – San Mateo Daily Journal
Construction Photos
- Sheet pile cleaning (12/1/23)
- Egress Bridge backfill work (11/28/23)
- Asphalt Demo on Section 3 (10/5/23)
- Contour to Ramp Excavation (9/28/23)
- Slurry Seal on Beach Park Boulevard (8/4/23)
- Access Path Anchor Repairs (7/12/23)
- Bayside Access Path Subgrade Remediation (6/27/23)
- Sign Installation (5/1/23)
- Asphalt Placement (4/13/2023)
- Concrete Stairs Placement (3/15/2023)
- Concrete Cap Concrete Placement (2/10/2023)
- TEI Drilling Street Lights 1/30/2023
- MSE block placement (12/28/2022)
- Ramp replacement (11/10/22)
- Working on footing adjustment (10/31/2022)
- build out form work (9/29/2022)
- Pedestrian bridge at Bayside Towers (8/31/2022)
- Rebar placement inspection (7/28/2022)
- Lagoon outfall formwork removal (6/27/2022)
- Loading rip/rap into haul truck (5/26/2022)
- RW2 Excavation in progress (4/28/2022)
- Rebar placement in progress (3/2/2022)
- Footing segment 1 concrete placement (2/9/2022)
- Excavation of FW-18 (1/14/2022)
- Block placement (12/9/2021)
- Final inspection on subgrade (11/23/2021)
- Concrete placement in progress (10/22/2021)
- SCCI X2 placing chaffer (9/7/2021)
- AP 15 placing LCC class I (8/24/2021)
- Demo of concrete debris (7/8/2021)
- Carpenters install false work (6/14/2021)
- Construction crews grade the trail
- Construction crews prepare sheet piles for installation
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Installing fence posts along the trail from Shorebird Park to San Mateo bridge (12/30/20)
- The contractor continues to install sheet piles along Shorebird Park (12/30/20)
- Tractors install fencing and work on excavation (12/30/20)
- The contractor continues to work on excavation, adding soil fill and compaction (12/30/20)
- The contractor prepares for the fencing installation (1/8/21)
- The contractor prepares for fencing installation (1/8/21)
- The contractor received materials to preparing for fencing installation (1/8/21)
- The contractor continues to work on excavation, adding soil fill and compaction (1/15/21)
- The contractor continues to install sheet piles (1/15/21)
- Construction crews install sheet piles along the levee (1/15/21)
- Constructions crews continue to level the soil (1/15/21)
- Fencing posts are installed to prepare for fencing installation (1/15/21)
- Crews continue to prepare for sheet pile installation (1/22/21)
- Construction crews excavate the ground (1/22/21)
- Crews change out a speed limit sign on Beach Park Boulevard (1/22/21)
- Crews continue to excavate the ground and install sheet piles (1/22/21)
- Crews restriped and reconfigured Beach Park Boulevard (1/29/21)
- Crews are stockpiling sheet piles to be available for installation (1/29/21)
- Crews continuing with grading, paving and clearing trail surfaces (1/29/21)
- Crews restriped and reconfigured Beach Park Boulevard (1/29/21)