Renderings
- Levee Project Wall Type Examples Map
- Near San Mateo Border I Wall Type: Earthen Levee (no wall)
- San Mateo Bridge Undercrossing I Wall Type: Concrete Flood Wall
- Bridgeview Park I Wall Type: Hybrid Sheet Pile
- Bay Trail Adjacent to Beach Park Blvd I Wall Type: Hybrid Sheet Pile
- Shorebird Park I Wall Type: Earthen Levee (no wall)
- Foster City Blvd & Beach Park Blvd I Wall Type: Hybrid Sheet Pile
- Port Royal Park I Wall Type: Concrete Flood Wall
- Schooner Bay Park (2nd Story View) I Wall Type: Hybrid Sheet Pile
- Bay Trail (2nd Story View) I Wall Type: Hybrid Sheet Pile
Detour Routes
Articles
*Please note a subscription may be needed to view the articles below.
- June 18, 2021 – San Francisco Chronicle
- August 10, 2021 – San Mateo Daily Journal
- June 11, 2022 – San Mateo Daily Journal
Construction Photos
- Asphalt Placement (4/13/2023)
- Concrete Stairs Placement (3/15/2023)
- Concrete Cap Concrete Placement (2/10/2023)
- TEI Drilling Street Lights 1/30/2023
- MSE block placement (12/28/2022)
- Ramp replacement (11/10/22)
- Working on footing adjustment (10/31/2022)
- build out form work (9/29/2022)
- Pedestrian bridge at Bayside Towers (8/31/2022)
- Rebar placement inspection (7/28/2022)
- Lagoon outfall formwork removal (6/27/2022)
- Loading rip/rap into haul truck (5/26/2022)
- RW2 Excavation in progress (4/28/2022)
- Rebar placement in progress (3/2/2022)
- Footing segment 1 concrete placement (2/9/2022)
- Excavation of FW-18 (1/14/2022)
- Block placement (12/9/2021)
- Final inspection on subgrade (11/23/2021)
- Concrete placement in progress (10/22/2021)
- SCCI X2 placing chaffer (9/7/2021)
- AP 15 placing LCC class I (8/24/2021)
- Demo of concrete debris (7/8/2021)
- Carpenters install false work (6/14/2021)
- Mobilizing equipment (5/11/2021)
- Reinforced concrete and boulders (5/3/2021)
- Concrete piping removal (4/29/2021)
- Floodwall framework installation (4/19/2021)
- Sheet pile installation (4/16/2021)
- Sign installation along Beach Park Blvd (4/12/2021)
- Beach Park Blvd staging (4/7/2021)
- Beginning of excavation for embankment (4/6/2021)
- Rebar installation (4/2/2021)
- Sheet pile installation (3/26/2021)
- K-rail painting (3/22/2021)
- Soil compaction (3/16/2021)
- Sheet pile installation (3/12/2021)
- Crews loading a dump truck with soil (3/5/2021)
- Construction crews grade the trail
- Construction crews prepare sheet piles for installation
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Sheet pile installation near Sea Cloud Park (12/18/20)
- Installing fence posts along the trail from Shorebird Park to San Mateo bridge (12/30/20)
- The contractor continues to install sheet piles along Shorebird Park (12/30/20)
- Tractors install fencing and work on excavation (12/30/20)
- The contractor continues to work on excavation, adding soil fill and compaction (12/30/20)
- The contractor prepares for the fencing installation (1/8/21)
- The contractor prepares for fencing installation (1/8/21)
- The contractor received materials to preparing for fencing installation (1/8/21)
- The contractor continues to work on excavation, adding soil fill and compaction (1/15/21)
- The contractor continues to install sheet piles (1/15/21)
- Construction crews install sheet piles along the levee (1/15/21)
- Constructions crews continue to level the soil (1/15/21)
- Fencing posts are installed to prepare for fencing installation (1/15/21)
- Crews continue to prepare for sheet pile installation (1/22/21)
- Construction crews excavate the ground (1/22/21)
- Crews change out a speed limit sign on Beach Park Boulevard (1/22/21)
- Crews continue to excavate the ground and install sheet piles (1/22/21)
- Crews restriped and reconfigured Beach Park Boulevard (1/29/21)
- Crews are stockpiling sheet piles to be available for installation (1/29/21)
- Crews continuing with grading, paving and clearing trail surfaces (1/29/21)
- Crews restriped and reconfigured Beach Park Boulevard (1/29/21)
- Construction crews removing LED at designated light pole (2/16/21)
- PG&E gas line relocation at 3rd Avenue (2/16/21)
- Construction crews removing light poles from Beach Park Boulevard (2/16/21)
- Excavation and compaction in preparation for sheet pile installation (2/17/21)